Isolation of STEP Tunnel – Steel Bulkhead (Dubai)
Installed a steel bulkhead to isolate a section of the STEP tunnel, enabling dry access for works.
IMCA, ADC, IDSSC Certified • Serving Qatar, and GCC
Explore featured marine projects and commercial diving case studies delivered by Blue Core Marine Works—on time, safely, and to specification.
Installed a steel bulkhead to isolate a section of the STEP tunnel, enabling dry access for works.
Diving support to install anchoring systems, steel structures and icon foundations for waterfront fireworks displays.
Performed Indian Register of Shipping (IRS) in-water survey for barge Scorpio D with condition reporting.
Conducted an in-water RINA survey of the vessel Sea Galaxy including hull and appendages.
RINA class in-water survey of barge Altair 1 with hull condition and anode status verification.
Installed multiple short outfall discharge pipes with supports and seabed protection measures.
Relocated seagrass beds from impact zones to prepared receiving sites with monitoring and reporting.
Performed inspection of seawater intake (SWI) bays, cleaning screens and documenting findings with HD video.
Designed and installed a reef workframe (RWF) to support safe extraction and reattachment during coral relocation.
Constructed roadways, drainage networks and utility corridors across Al Kharaitiyat and Izghawa districts.
Delivery of roads, drainage and utilities in Muaither with associated earthworks and traffic management.
Road and infrastructure package delivery in the Industrial Area with earthworks, utilities and drainage.
Performed maintenance/small-scale dredging to improve navigable depth at Smaisma Place waterfront.
Executed small marine construction works at Smaisma Place, including shore protection and access features.
Cleared submerged concrete blocks at Beach 19 to improve swimmer safety and beach aesthetics.
Share your scope and we’ll propose a safe, efficient delivery plan.