Isolation of STEP Tunnel – Steel Bulkhead (Dubai)

Installed a steel bulkhead to isolate a section of the STEP tunnel, enabling dry access for works.

Challenge

Precision fabrication for a confined underwater interface and strict dewatering criteria.

Approach

3D templating, gasket selection, staged installation, and leakage testing.

Outcome

Tunnel section isolated safely with zero leakage beyond tolerance.