Removal of Bund No. 3 at Gewan Island
Dismantled and removed temporary construction bund No. 3 to open water exchange around Gewan Island.
IMCA, ADC, IDSSC Certified • Serving Qatar, and GCC
Explore featured marine projects and commercial diving case studies delivered by Blue Core Marine Works—on time, safely, and to specification.
Dismantled and removed temporary construction bund No. 3 to open water exchange around Gewan Island.
Built a stabilizing groyne to reduce longshore drift and retain nourished sands at Al Maha Island.
Imported and placed high-spec beach sand to restore beach profiles at Al Maha Island.
Final marine adjustments for the waterpark: protection fine-tuning, wayfinding pontoons and QA close-out.
Design and build of a small marine access and shoreline protection solution for Halul Café waterfront.
Placed graded rock lining to protect the artificial lake perimeter and underwater slopes.
Variation works to the promenade marine edge per Site Instruction No. 1, including adjustments to protection details.
Additional shoreline protection and floating access systems complementing the waterpark marine scope.
Marine interfaces for the waterpark: shoreline shaping, pontoons and access features.
Constructed robust rock revetments and marine edge details for the hotel waterfront.
Supplementary package for Sport Marina including additional pontoons, utility tie-ins and alignment verification.
Marine interface works for Westbay North public realm, including shoreline protection, small-scale dredging and access elements.
Port improvement works across Al Wakra, Al Khor and Al Ruwais including quay maintenance and fendering.
Constructed sections of the Ras Abu Aboud promenade marine edge including protection and access details.
Marine building works for the waterfront at Doha Marriott Gulf Hotel including revetment and access features.