info@bluecoremarine.com
Blue Core Marine Blue Core Marine Works

Removal of Existing Concrete Blocks

Cleared submerged concrete blocks obstructing new marine works using controlled rigging and lift bags.

Challenge

Unknown block sizes and embedment in silty seabed.

Approach

Pre-removal video survey, probe checks, then staged lifts with containment for loose debris.

Outcome

Area made obstruction-free with documented removals.