info@bluecoremarine.com
Blue Core Marine Blue Core Marine Works

Doha Port – Sport Marine (Diving)

Installed silt curtains and performed underwater cleaning of piles to control turbidity and prepare surfaces.

Challenge

Maintaining water clarity during adjacent dredging and construction.

Approach

Perimeter silt curtains with regular inspections; staged pile cleaning under low‑tide windows.

Outcome

Effective turbidity control and prepared piles ready for subsequent works.