Private Yacht Underwater Services (4 Units)
Qatar • 02/2017-03/2017
IMCA, ADC, IDSSC Certified • Serving Qatar, and GCC
Installed silt curtains and performed underwater cleaning of piles to control turbidity and prepare surfaces.
Maintaining water clarity during adjacent dredging and construction.
Perimeter silt curtains with regular inspections; staged pile cleaning under low‑tide windows.
Effective turbidity control and prepared piles ready for subsequent works.